0



In the years 1992 - 2002
FRANKONIA Eurobau developed
developed real estate in all asset classes.
This experience formed the basis for the development of urban districts.

The history from 1992 to 2002

The foundation for success: Experience

Much of what FRANKONIA Eurobau can build on today as expertise cannot be learned at a university. Rather, it was essentially developed from lived experience in the first 10 years and in the new center of Germany: planning sophistication, technical know-how in highly specialized areas, urban planning empathy, negotiation skills and interpersonal skills. Above all, however, FRANKONIA Eurobau has developed the entrepreneurial attitude of respecting the tried and tested while at the same time trying out new things.

Country estate
Plößnitzer Mühle

First major construction project by FRANKONIA Eurobau. Here near Halle/Saale 80 residential units were built in the form of semi-detached and terraced houses.

Completion 1995

Braschwitz,
Halle an der Saale

One of the first construction projects of Frankonia Eurobau in Braschwitz, Halle/Saale, marks a significant significant contribution to the urban development in the region. region. On an area of 31,000 square meters square meters, 250 single-family houses, which are characterized by modern architecture and sustainable and sustainable construction methods.

Completion 2000

Büschdorf,
Halle an der Saale

Another building project of Frankonia Eurobau was initiated in Halle/Saale. Over an area of 31,800 square meters square meters spread over five phases, a total of 544 rental apartments apartments.

Completion 1998 - 2000

Max Planck Institute,
Halle an der Saale

The new building, based on a factory/edge villa in the Wilhelminian style quarter and surrounded by a park, represents a careful integration urban/structural integration. The listed old building prompted a sensitive a sensitive architectural approach for the for the cubic institute building with floor-to-ceiling glazing and exposed/concrete ceiling panels that convey a visual lightness.

Completion 2002

Markt Carrée with city/archive, Halle on the Saale

The Markt Carrée, completed in 2004 on the market square in Halle, serves as an extension to the existing Kaufhof department store and is characterized and is characterized by its central location. Nestled between the shopping shopping streets Leipziger Straße and Große Ulrichstraße, all important important urban facilities and shops and stores are within walking distance. The new 5-storey building connects the existing building with the newly with the newly constructed part through a passage the basement.

Completion 2004

Händelgalerie,
Halle an der Saale

The Händelgalerie is characterized by its stores and contributes to a culturally and socially enriching conclusion to the square. As a listed residential and commercial property, it occupies a central position in the urban fabric of the city center. The building/ensemble serves both retail and residential purposes.

Completion 1998

Händelhauskarree,
Halle an der Saale

The Händelhauskarree, characterized by the philosophy of Frankonia Eurobau, emphasizes quality and service. in the foreground. Formerly dilapidated buildings and wasteland in the in the historic Händelviertel new urban life was gradually created. Substance worth preserving was expertly and attention to detail with new buildings and thus created a stylish stylish juxtaposition of history and and modernity. Completed in 2002, the Händelhauskarree comprises the Händelhaus, offices and stores, residential units, medical practices, restaurants, the Protestant university, the music college/university/school of the Martin Luther University, a a city library and thus enables living and working in one of the most attractive metropolitan centers centers in Germany.

Completion 2003

City History Museum,
Leipzig

The Leipzig City History Museum, with the heart of the Old Town Hall, represents an important part of Leipzig's Leipzig's culture and history. After the merger with the Museum of History of the Workers' Movement in 1960 and several expansions and reorganizations and restructuring in the following decades decades, a reopening took place in 1990. An overall concept for the museum, which 1995, finally led to a restructuring finally led to a restructuring and and a new building, which was opened in 2004 opened in 2004 and is now part of the Museum Quarter. Today the museum is not only a point of attraction for visitors for visitors, but is also a testimony to testimony to Leipzig's rich history and helps to preserve the city's cultural heritage of the city. and to present it.

Completion 2004

Living at Reusspark,
Gera

The former barracks complex is a is a cultural monument of the state/development company Thuringia. In the first construction phase 174 socially subsidized apartments subsidized apartments for rent were developed.

Completion 2000

Gildehaus,
Halle an der Saale

Completion 2000

Simon-Dach-Straße,
Berlin-Friedrichshain

Completion 2008

Kastanienallee,
Berlin-Prenzlauer Berg

Completion 2008

Canada House,
Bonn

The former embassy of the country Canada was rebuilt by FRANKONIA Eurobau rebuilt, extended and extended by a glass, elliptical extension extension. Today, the building is primarily departments of Deutsche Post AG work here.

Completion 2002

Hollandhaus,
Bonn

The Hollandhaus in the neighborhood of the Hollandhaus, which is located in the neighborhood of the former Royal Dutch Embassy Embassy, was also converted and extended by FRANKONIA Eurobau converted and extended. This this listed building was also rented rented by Deutsche Post AG.

Completion 2004

Project locations

Bitte akzeptieren Sie den Cookie 'Erlebnis' um diesen Inhalt angezeigt zu bekommen.

CONTACT